Friday, June 29, 2007

 

Jun 29th

The chancel steps are being framed in (foreground) and the choir loft is being framed in (background). There is a lot of activity in the sanctuary now as the crews that were working in the children's wing are now working here.

 

Jun 28th


This is the hallway as you enter the children's entrance. This now has all the ceiling tile and lights in place. The hallway will eventually be carpeted which will finish it out.

 

Jun 27th

The vinyl flooring (which covers 1/2 of each of the classroom floors) is going down now. The accent color squares pick up the color of the accent wall in each room.

Tuesday, June 26, 2007

 

Jun 26th

Ceiling tiles have been put in many of the children's wing rooms. The rooms are looking much more finished now and it won't be long before the cabinets and flooring are installed.

 

Jun 25th



We have lights in the children's wing! And we got the ceiling inspection completed so we can start putting up the ceiling tiles. It really brightens up the rooms and highlights the accent wall colors.

 

Jun 23rd


Here is a better picture of the pond. It is graded, lined with clay and ready to be filled with water. The topsoil has been spread around and is ready to be seeded. The fountain is ordered and a plan has been developed for filling it up.



Monday, June 25, 2007

 

June 22nd

We are now driving on asphalt into the church. No more dirt and gravel roads. The grading for the pond is nearly done and the fountain for the pond is on order. This will hopefully be a great view from the road.

 

June 21st

I love this view of the building. This side of the church is now finished including the downspouts.

 

Jun 20th

What a difference one day makes! These guys are fast. The cafe area is really taking shape and all the curves and ceiling elevations really make this a unique and inviting space.

Tuesday, June 19, 2007

 

Jun 19th

Sheetrocking continues at a rapid pace. This picture is taken from by the cafe looking toward the main entrance.

 

Jun 18th

What you see is our new 7-1/2' Yamaha Grand Piano. It was delivered last week to Shirks Piano. Marilyn took a few minutes on Monday to stop by and play a few songs........ amazing. We can't wait to hear this at Clay North....

Friday, June 15, 2007

 

Jun 15th

The clay to line the retention pond is being put into place. It won't be long until we have to figure out how to fill this with water and get the fountain up and running.










Thursday, June 14, 2007

 

June 14th

This was taken as you exit the property and look south (left). Ironwood is being widened to add a deceleration lane to make it safer for cars pulling into Clay North.

 

June 13th

The first of the flooring has been installed. This tile is in the women's restroom by the infant and nursery rooms. We set a new record for the number of construction workers onsite: 61 (the old record was 54). They are working hard to catch up the time lost due to the wet and then bitter cold winter.

Tuesday, June 12, 2007

 

Jun 12th

The sample pew (one of the pastor's pews) was just delivered! Betty was the first give this a try and gave it two thumbs up.

 

Jun 11th

The binder layer of the parking lot is being put into place. The whole parking lot is done and they are finishing up the drop off lane that goes by the entrances. They also completed the drive from the gate up to the church and will soon be working on widening Ironwood to allow for traffic to go around those slowing down to pull into Clay North.

 

Jun 9th

The white exterior for the cross shape on the left side of the building is now visible.

 

Jun 7th

This view is looking into the Children's worship space from the lobby area. The back wall will be the teaching space and will be elevated some. The energy and excitement of the FAITH WORKS children's ministry will explode when this new space is available

Monday, June 11, 2007

 

Jun 5th

Tuesday morning there was a spectacular double rainbow. Denny, one of the construction crew, captured this picture on his cell phone and sent it to me. What an uplifting sight.

Sunday, June 03, 2007

 

Jun 3rd

This is the latest look from Ironwood road.

 

Jun 2nd

This is one of 11 children's classrooms that will serve both for Sunday morning Sunday School and mid-week preschool. Each room has it own accent color. The grid for the ceiling tiles is up now in most of these rooms.

 

Jun 1st

The block on the back wall of the chancel in the sanctuary is done and the supports for the cross are in place. The sanctuary one space that is hard to capture on film and is best seen in person