Friday, August 31, 2007

 

Aug 31st

The lights in the lobby have been installed as have the speakers and projectors in the sanctuary.



Thursday, August 30, 2007

 

Aug 29th


The speakers are being hung with care and the projectors and screens have now been hung. The transformation of the sanctuary continues.....


Wednesday, August 29, 2007

 

Aug 29th

The sactuary is being transformed by the woodwork that is being done. The chancel wall and floor molding has been installed. The tech booth railings and floor molding are in place and the cross is hanging over the alter area.......WOW





 

Aug 27th

The cross and the communcion kneelers have been delivered. The craftsmanship of these is beautiful. Note: the kneelers will have padding......



 

Aug 24th

We have water (hot and cold) available throughout the building now. This includes fire protection and irrigation too.

Thursday, August 23, 2007

 

Aug 23rd

The coat racks have been installed in the space right behind the welcome area. It is much more obvious what this room is for now.

 

Aug 22nd


Shopping for trees! We could have picked a cooler, less humid day but it is exciting to think about how these will look when planted on our property at Clay North. We think we will be getting (and planting) 96 trees.





 

Aug 21st

The binder layer for the driveway bewtween Clay North's parking lot and the Swanson School parking lot has been layed. We are waiting for the asphalt top to be put down and a gate to be installed.

 

Aug 20th

The main entrance has been completed with the recent addition of the soffit and the lighting in the soffit.

Friday, August 17, 2007

 

Aug 17th

The children's check in counter has been installed. This will provide a large surface for check-in and information transfer.

 

Aug 16th


One side of the sanctuary has the reflective sound panels up and all of the sound absorption panels are now installed. On the right is one of the two tech booth. The countertops are installed and they look very spacious so far.

Tuesday, August 14, 2007

 

Aug 14th

The sanctuary has been painted and the sound reflection panels (left) and the sound absorption panes (right) are being put into place. The sanctuary looks bigger each day.....



Monday, August 13, 2007

 

Aug 11th

The fountain is now hooked up and working! This is the view from the driveway into the parking lot.

Thursday, August 09, 2007

 

Aug 9th

The flooring in the Children's Worship space has been installed. I need a wider lense to capture the whole room






Wednesday, August 08, 2007

 

Aug 8th


The welcome area and cafe areas now have lights on. The grass is growing and the grounds are starting to green up. On the right is the 'before' pictures of part of the sanctuary wing ceiling. Check back in a few days to see the 'after' picture.




 

Aug 7th

The connecting road between the Clay Church parking lot and the Swanson School parking lot. The race is on to get most of this complete before school starts up.

Monday, August 06, 2007

 

Aug 3rd

If you look closely you will see lights hanging from the sanctuary ceiling. Most of the work left to be done on the building is now focused on the sanctuary.

Thursday, August 02, 2007

 

Aug 2nd


On the left is the view from the Swanson School parking lot. The trees frame the church really well. The access drive that will connect the two parking lots is well underway. We now have grass starting to grow. It is most evident at the back of the building where the center picture is take. And the picture on the right...... I'll let you decide where you think this is at.




 

July 31st


The removable panels in the adult classroom are intalled (left). Crews have started to paint the sanctuary (center) and the flooring in the cafe is being put down (right).