Saturday, January 27, 2007

 

January 26th

The Steel is here, the steel is here !
There are piles steel of components all over the parking lot. Check back next week as the crews are planning to start erecting the steel on Monday and I hope to be on site each day of the week to get pictures

Sunday, January 21, 2007

 

January 20th

About 1/2 of the building floor has been graded and covered with insualted tarps (grey and black area in the right side of the picture) in preparation for pouring of the concrete floor.

 

January 19th

Pastor Herb and Pastor Kim checking out the progress with the sanctuary in the background

 

January 17th


Here is the front of the chancel area. The lowest footing (at the top of my head in the shadow) will be the front face of the chancel.


 

January 13th

Time Lapse photo spot. Hard to even tell it's winter in South Bend - except for the trees and sky in the background. Most of the work the past week has continued to be underground installation of plumbing lines and electrical conduits

Saturday, January 13, 2007

 

January 10th

The transformer is being wired in today. It looks like wrestling a bowa constrictor as these two guys work to connect the lines. We should have permanent power up and running by the end of the week.
Factoid: Incoming voltage is 34,500