Sunday, January 21, 2007

 

January 20th

About 1/2 of the building floor has been graded and covered with insualted tarps (grey and black area in the right side of the picture) in preparation for pouring of the concrete floor.

Comments: Post a Comment



<< Home

This page is powered by Blogger. Isn't yours?