The steel continues to go up piece by piece. There are now 2 cranes on-site in preparation for the setting of 2 90' beams that will run the length of the sanctuary. I am told that each beam weighs in at about 6 tons (12,000 pounds). This is now VERY visible from Ironwoood road and gives a feel for what people will see as they drive to and fro on Ironwood.... If you look closely you can see a cross that is being formed by the steel. There is one more horizontal piece on the left side needed to complete this.