Thursday, March 29, 2007
March 25th

This is what is looks like from the top of the ladder that is on the south property line. The space in front of the building will be part of the parking lot. The flat roof is installed over the children's wing (right side of the building). The exterior walls are installed on the East side and some on the North side. Nearly all of the sturctural steel is in place. WOW.........
