Wednesday, March 07, 2007
March 7th
Windows were installed today on both the north wall (shown) and the east wall in the children's class rooms. The bubble in the middle is a tarp that hot air is being blown under to thaw and then dry out the ground so we can pour the concrete floor. Lots of activity today and even though the temps were below freezing, there was sun and no wind. It actually felt warm !