Saturday, April 28, 2007

 

April 27th

There are now rooms in the Children's wing that are completely sheetrocked. The crews have also poured the floor of "Herb's Hall" which is the basement passage from from the right side of the chancel to the left side. The back walls of the sanctuary are also studded in so the size of the sanctuary can be seen.

Comments: Post a Comment



<< Home

This page is powered by Blogger. Isn't yours?